Projects
For our clients privacy, Genesis has a policy prohibiting the publication of information regarding completed environmental projects.
Featured International Projects:
Airplane Hangar & Office Building (Benin, Nigeria)
Genesis has been contracted to design, engineer, procure and construct an airplane hangar, office building, storage facility and fuel tank facility for a Nigerian government entity. The hangar includes a unique design that can erected in a quick time frame with a membrane cover that reduces heat from UV rays and can be deconstructed and relocated at will of owners. The office building is two stories at around 4,000 square feet including contractor provided furniture, central air conditioning and a septic system. Construction to be completed by late 2011.
Below is a conceptual drawing of the side elevation: Hangar; office building; storage facility:

Featured Hospitality Projects:
Gulfview (Clearwater, Florida)
We demolished all building materials excluding the original shell on this seven story hotel. Exterior build back included steel framing, EFIS, windows, balcony railings, parapet walls, roofing, etc. Interior finish out included metal stud framing, drywall, mechanical, electrical, plumbing, life safety/fire alarm, vinyl wall covering, painting, custom cabinetry/millwork, wet bars, granite countertops, carpet, FF&E, etc. We were faced with many last minute design/build requirements which we implemented seamlessly. Genesis self performed the job at 65% and completed the building to the highest standards within a five month timeframe.
Holiday Inn (Billings, Montana)
A full interior renovation to 319 guestrooms, all public spaces and the hotel's convention center. Guestroom renovations included new carpet, vinyl wall covering, FF&E, ADA compliant bathroom sinks, etc. Public space renovations were based on an extensive PIP list and short deadline from IHG. Genesis performed a large portion of the the work as design/build in order to deliver a quality product with minimal down time. Renovations included new ceiling tile, parabolic light fixtures, coffer ceilings, refinishing all meeting room doors/chair rails, ceramic floor tile, new granite registration desk with ADA check in, carpet, vinyl wall covering, FF&E, etc. The hotel's restaurant received a complete interior demolition and build back. Interior finish out included moving walls, new suspended ceilings, recessed lighting, granite ADA compliant hostess stand and buffet, paint, vinyl wall covering, carpet, etc.
Holiday Inn (Cheyenne, Wyoming)
A full interior renovation to 274 guestrooms, all public spaces and exterior work. Guestroom renovations included new vinyl wall covering, carpet, FF&E, etc. Guest bathrooms received new ceramic tile shower surronds, vinyl wallcovering, FF&E and ADA modifications. The guestroom corridors ceilngs where replaced with new suspended acoustical ceiling tile and grid, and new life safety devices. Public space renovations included new vinyl wall covering, carpet, paint, custom millwork, FF&E, ADA modifications, etc. All public area ceilings were replaced with new acoustical ceiling tile and lay-in parabolic light fixtures. The hotel's registration and restaurant were design/ built by Genesis and completely reconstructed including new ceilings, custom ADA granite counter tops, new wall and floor finishes, and new electrical throughout. The restaurant buffet and serving area was design/built by Genesis as well which included custom granite, and new wall and floor finishes. Daily schedule modification and heavy coordination was key in accomplishing this scope.
Holiday Inn (Lubbock, Texas)
Exterior and interior renovations of two Holiday Inns within a five mile radius of each other. Exterior work included large amounts of ADA modifications including welding all exterior stairwells to meet current code. Guestroom renovations included ADA modifications, FF&E, new granite counter tops, sinks, fixtures, and plumbing. Both hotel public space renovations included millwork, ceramic floor tile, granite counter tops, new meeting room doors, vinyl wall covering, carpet, paint, FF&E, etc. All hotel meeting room ceilings were framed, drywalled, and finished as new coffer ceilings. The fitness center was a complete interior build-out by Genesis along with new finishes and custom mirrors. Both hotel restaurants were completely renovated including design/build construction by Genesis of new granite buffets, hostess stations, new electrical panels.
Marriott (Oklahoma City, Oklahoma)
While tackling a number of complicated structural issues with the hotel, Genesis was able to find effective and less expensive solutions than other competitors had suggested. A large amount of millwork, painting and flooring (pattered wood matching in lobby and resealing/re-taping of racquetball court) was part of the scope. The hotel had an extremely high occupancy throughout the duration of our work. We were quick to respond to events at the hotel by reorganizing our crews while minimizing noise and debris. This project was self-performed at 95% by Genesis.
Marriott (Norfolk, Virginia)
This project encompassed a diverse scope of work which included carpet repair, millwork, marble repair, vinyl wall covering replacement, carpet replacement, granite refinishing and electrical work. The exterior painting and porte cochere work for this property was challenging because of an unusually wet season. We were able to delegate our crews to different tasks in order to minimize down time. Because of a consistently high occupancy rate, our crews worked at different hours of the day in order to accommodate the staff and guests.
Marriott (Palm Beach Gardens, Florida)
With this hotel being a high occupancy establishment, Genesis was given a 10 day time line in order to replace and assemble FF&E in 138 rooms. With a myriad of delivery constraints, we were able to accomplish our goal. In addition to assembling 138 rooms, Genesis provided a highly durable, glossy and non-stick finish to all the ground surfaces in the entrance and surrounding the pool.
Hilton (Lafayette, Louisiana)
Exterior and interior renovation to a 327 room hotel. Interior renovations consisted of replacing all crown molding and base board in all guestroom corridors, refinishing meeting room doors, replacing meeting room carpet, modifying plumbing and installing new granitecounter tops and custom wood vanity bases in the guest bathrooms, and installing new flat screen TVs in the guestrooms. In addition, the kitchen ceiling was replaced with new acoustical ceiling tile/grid and new 2x4 electrical lay-in fixtures. All light poles in the parking lot were painted as well.
Doubletree (Tulsa, Oklahoma)
This project consisted of a complete tear out and renovation of a fitness center; following by a 374 guest bathroom renovation. The guest bathroom renovations included refinishing all bath tubs with a non-slip texture, installing new tile tub surrounds, and installing ADA compliant solutions for grab bars. Scheduling adjustments were made throughout the project to account for the hotel's high occupancy rates. Genesis self-performed this work 100% with our skilled labor force.
Examples of Other Completed Projects:
| The Driskill Hotel (Austin, TX) | Kings Gate (Plano, TX) |
| Baylor Hospital (Irving, TX) | First United Methodist Church (Fairfield, TX) |
| Holiday Inn (Bradenton, FL) | Geomap Company (Plano, TX) |
| Brookshire Cove Apartments (Dallas, TX) | Shoal Creek Apartments (Bedford, TX) |
| Player's Club Apartments (Carrollton, TX) | Waxahachie Post Office (Waxahachie, TX) |
| Medical Plaza of Ft. Worth (Ft. Worth, TX) | Heritage Square Tower II (Dallas, TX) |
| Atmos Energy (Dallas, TX) | Public Storage (Ft. Worth, TX) |
| Preston Commons (Dallas, TX) | Sterling Plaza 11th Floor (Dallas, TX) |
| Galleria Mall (Dallas, TX) | Sierra Ridge Apartments (Austin, TX) |
| Stella Apartments (Dallas, TX) | Carillon Towers (Dallas, TX) |
| Victoria Square (Denton, TX) | Holiday Inn (Ft. Smith, AR) |
| Millen Oil Company (Dallas, TX) | Trails at Vintage Creek (Austin, TX) |
| Lake Highland ISD (Richardson, TX) | La Arboleda Apartments (Dallas, TX) |
| Sterling Plaza (Dallas, TX) | Promenade Tower (Dallas, TX) |
| Chase Bank (Garland, TX) | Hot Box Pizza (Denton, TX) |
| Stoneleigh Hotel (Dallas, TX) | Lacima Building (City of McKinney) |
| Bellview Apartments (Dallas, TX) | Harwood Center Restrooms (Dallas, TX) |
| USPS Northhaven Station (Dallas, TX) | Former Golden Triangle Gym (Dallas, TX) |
| Bank of America (Dallas, TX) | Nortel (Richardson, TX) |
| Campbell Centre II (Dallas, TX) | Texas A&M Education (College Station, TX) |
| Sheraton Suites Market Center (Dallas, TX) | Texas A&M Gym (College Station, TX) |
| The Shops at Willow Bend (Plano, TX) | Gateway Towers 9th Floor (Dallas, TX) |
| Plymouth House Apartments (Dallas, TX) | Eastside Village Apartments (Plano, TX) |
| Northpark Central (Dallas, TX) | Comerica Bank (Dallas, TX) |
| Convergence Office Center (Dallas, TX) | USPS DFW Airport (DFW Airport, TX) |
| Marsalis Apartments (Dallas, TX) | Community Theater (Duncanville, TX) |
| CSC Building (Austin, TX) | Royal Oaks Apartments (Dallas, TX) |
| Oxford Apartments (Arlington, TX) | Brookhaven club (Dallas,TX) |